Biomass to energy plant using oil mill residue.
Nominal Power: 12,4 MW.
Technology: Incineration, Rankine cycle without regeneration.
Boiler: Ahlstrom / 49 t/h @ 87 bar (a) / 482°C.
Fuel: Olive cake: 65.000 t/year.
Steam Turbine: Siemens.
Operator: EMPRESA OLEÍCOLA EL TEJAR, S.C.A.
Status: In Operation
EMPRESA OLEÍCOLA EL TEJAR, S.C.A.
1995
Palenciana, Córdoba, Spain.
Engineering, Consultancy and Design:
Feasibility Study.
EPCM/Project Management