VETÉJAR - GHESA Ingeniería y Tecnología, S.A.
2046
portfolio_page-template-default,single,single-portfolio_page,postid-2046,qode-quick-links-1.0,ajax_fade,page_not_loaded,,vertical_menu_enabled,qode_grid_1300,side_area_uncovered_from_content,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-11.2,qode-theme-bridge,wpb-js-composer js-comp-ver-5.2.1,vc_responsive

VETÉJAR

About This Project

Biomass to energy plant using oil mill residue.

Nominal Power: 12,4 MW.

Technology: Incineration, Rankine cycle without regeneration.

Boiler: Ahlstrom / 49 t/h @ 87 bar (a) / 482°C.

Fuel: Olive cake: 65.000 t/year.

Steam Turbine: Siemens.

Operator: EMPRESA OLEÍCOLA EL TEJAR, S.C.A.

Status: In Operation

CLIENT:

EMPRESA OLEÍCOLA EL TEJAR, S.C.A.

YEAR:

1995

LOCATION:

Palenciana, Córdoba, Spain.

Provided Services:

Engineering, Consultancy and Design:
Feasibility Study.
EPCM/Project Management

Category
Biomass, Renewable Energy

Back