The completed refurbishment works included the following: Study and refurbishment of the hydraulic system. Design and new installation of lighting, replacing dry projectors with underwater, white, adjustable fixtures, including the design of new switchgear assemblies.
Total pumping power: 1,842 HP.
Barcelona town hall
1992
Barcelona, Spain.
Rehabilitation.