portfolio_page-template-default,single,single-portfolio_page,postid-2049,qode-quick-links-1.0,ajax_fade,page_not_loaded,,vertical_menu_enabled,qode_grid_1300,side_area_uncovered_from_content,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-11.2,qode-theme-bridge,wpb-js-composer js-comp-ver-5.2.1,vc_responsive

PATACHE

About This Project

This plant was moved from the US to Chile. During the process, equipment update and overhaul were carried out. the installation of a Pulverized Carbon Injection system to the existing boiler in order to utilize the available fuel was one basic improvement

 

Nominal Power: 1 x 150 MW.

Boiler: Foster Wheeler.

Fuel: Pulverized Coal.

SteamTurbine Generator: GE.

Operator: CELTA S.A.(ENDESA S.A.)

Status: Operational

CLIENT:

JV Mecánica de la Peña + Foster Wheeler + GE.

DATE:

2011

LOCATION:

Patache, Chile.

SERVICES PROVIDED:

Engineering, Consultancy and Design:
Engineering Package.
Supervision of Construction & Commissioning. EPC/Turnkey project:
EPC for Pulverized Coal Injection Package.

Category
Coal, Fossil Fuels